How much shiplap do I need, and how does the reveal change the coverage?
Shiplap coverage is the board’s face width minus the lap, plus whatever reveal you hold. A 5-1/2″ board with a 1/2″ lap covers 5″ flush, 5-1/8″ at a 1/8″ reveal, and 5-1/4″ at a 1/4″ reveal. Divide the wall height by that number, round up, and add a 10 to 15 percent cut allowance.
The short version
- Coverage per board = face width − lap + reveal. Nothing else matters to the count.
- Worked: a 3/4″ × 5-1/2″ board with a 1/2″ lap covers 5″ flush, 5-1/8″ at a 1/8″ reveal, 5-1/4″ at a 1/4″ reveal.
- A wider reveal covers more wall with fewer boards — the gap is doing some of the work.
- Add 10–15% for cuts. A UWP written quote already carries that allowance.
- Lay out from a full board at eye level, not from the floor, so the ripped board lands where nobody reads it.
The full answer
Board width is not coverage. A nominal 1×6 shiplap board measures 5-1/2″ across the face, but 1/2″ of that face is rabbeted away and hidden under its neighbour. What you actually gain per board is the exposed face — and the reveal you choose adds back to it, because holding a gap pulls the boards apart.
The formula
Coverage per board = face width − lap depth + reveal. On UWP stock, face width is 5-1/2″ on a 1×6 and the lap is 1/2″. Everything below is that one line, worked out.
| Reveal | Coverage per board | Boards for a 96″ wall | Boards for a 120″ wall |
|---|---|---|---|
| Flush | 5″ | 20 | 24 |
| 1/8″ (nickel gap) | 5-1/8″ | 19 | 24 |
| 1/4″ | 5-1/4″ | 19 | 23 |
Read that table the right way. The reveal buys you very little — one board on a standard wall, sometimes none. Choose the reveal because of how it looks, never to save material. The number that actually moves your order is the cut allowance.
Working out an order
- Measure each wall separately. Height × width, wall by wall. Do not average.
- Divide the height by the coverage figure and round up. That is rows per wall.
- Multiply rows by wall width to get linear feet, then convert to the board lengths being run.
- Subtract large openings only. Take out a door or a picture window; leave outlets, switches and small returns in — those become offcuts, not savings.
- Add 10–15%. Mitres, end-matching, a board with a defect, the cut you get wrong. Running short mid-wall on a milled-to-order run is the expensive mistake, not the surplus.
Layout: where the ripped board goes
Almost no wall divides evenly. One row will be narrower than the rest, and where you put it is a design decision you make before the first board, not after the last. Dry-stack the run on the floor and measure the remainder first.
- Running horizontal, full height: start full at the ceiling and let the ripped board land at the floor, where the baseboard covers it.
- Running horizontal to a chair rail: start full at the rail and rip at the floor, for the same reason.
- Running vertical: split the remainder in half and rip both end boards equally. A single narrow slice in one corner reads as a mistake; two matching ones read as intent.
- Never let the ripped board land at eye level or beside a door casing.
Three things that cost boards
- Skipping acclimation. Solid wood delivered into an unconditioned Houston house and installed the same day will move. Sticker it in the room with the HVAC running first.
- Not checking the first board. Every board inherits the first one’s line. Level it in both directions and re-check every four or five rows.
- Ordering the exact square footage. There is no such thing as zero waste on a milled run. The allowance is not padding.
Related products at UWP
Shiplap
CatalogEvery reveal drawn in section, two boards at the joint, so you can read the gap before you commit to it.
View →Board foot calculator
ProductConvert a milled run into board feet when the quote is priced on volume rather than face coverage.
View →Request a quote
ProductSend the wall measurements and the reveal you want; the written quote carries the cut allowance.