
Gorilla HD Utility Blades — 2-Notch
- Will-call code
- 20208
- Spec
- 2-notch · 0.025" thick
- Pack
- 100 / dispenser
- Pickup
- Tanner Rd, Houston
Gorilla heavy-duty 2-notch utility blades, 0.025" thick — 100 in a dispenser. For jobsite cutting of underlayment, carton and packaging.
Where it's used
General cutting
Underlayment, carton, shrink wrap, and packaging — the everyday jobsite knife blade.
2-notch fit
Standard 2-notch utility-knife blade — drops into common retractable and folding knives.
Bulk dispenser
100 blades in a dispenser so a fresh edge is always one swap away.
Pairs with: The 4" (20104) and 8" (20107) scraper blades for floor prep.
Questions
Will these fit my utility knife?
Yes — these are standard 2-notch utility blades that fit common retractable and folding utility knives.
How do I order this?
Order by code at the will-call counter (NW Houston / Tanner Rd). Pricing is quoted at pickup. Open a cash account to streamline repeat orders.
Do you ship, or is it pickup only?
Will-call at the Tanner Rd yard (9915 Tanner Road, NW Houston), or Houston-metro delivery scheduled on the quote.
Prep the floor.
The flooring and floor-prep these blades are made for — same Houston yard, one pickup.
Questions people ask about the jobs these ride along with
How much trim do I need? A room-by-room calculation guide.
Calculate baseboard by measuring the perimeter of every room, subtracting door openings, then adding 10% for waste. Casing needs 17 to 20 linear feet per standard door, 14 to 17 per window. Crown takes the same perimeter as base. Shoe and quarter round match the base. The trim and casing calculator on our site does the math by room — feed in dimensions, get a total order list.
Read the answer →What trim goes where? A room-by-room guide.
Trim choice should read as a consistent system across the house, not a room-by-room patchwork. Baseboard and casing run everywhere, sized to ceiling height and door scale. Crown is reserved for formal rooms in traditional homes and skipped in modern ones. Chair rail and panel mould go in formal dining and entry. Stair trim ties the upstairs and downstairs together.
Read the answer →How do you install a tongue-and-groove ceiling?
Run the boards perpendicular to the joists, or add furring at 16 inches on centre if you need to run them the other way. Acclimate first. Start with the groove edge to the wall, blind-nail through the tongue shoulder at 45 degrees into every joist, and leave a 1/2 inch expansion gap at the perimeter for the trim to cover.
Read the answer →How do I install hardwood stair treads?
A confident DIYer can install a hardwood stair tread retrofit in a weekend. The sequence: pull carpet and staples, prep the substrate flat and quiet, acclimate the treads for 5 to 7 days, dry-fit each tread, glue with a urethane construction adhesive, fasten with stainless trim screws (countersunk), plug, sand, and finish. Risers go in before treads on a full build; after, on a retrofit.
Read the answer →



