
Gorilla 4" Premium Scraper Blades
- Will-call code
- 20104
- Spec
- 4" wide · 0.020" thick
- Pack
- 100 / dispenser
- Pickup
- Tanner Rd, Houston
Gorilla 4" premium scraper blades, 0.020" thick — 100 in a safety dispenser. For floor prep, adhesive and finish removal, and scraping paint.
Where it's used
Floor prep
Scrape adhesive ridges, thinset skim, and old finish off subfloor before new flooring goes down.
Adhesive & finish removal
Knocks down dried mastic, glue, and paint slop on hard surfaces.
Safety dispenser
100 blades in a plastic dispenser — feed one at a time, no loose blades in the box.
Pairs with: The 8" scraper blade (20107) for wide work and utility blades (20208) for cutting.
Questions
4" vs 8" scraper blade?
The 4" (0.020") is the everyday blade for handheld scrapers and detail work. Step up to the 8" (0.036", item 20107) for wide floor scraping and heavier stock.
How do I order this?
Order by code at the will-call counter (NW Houston / Tanner Rd). Pricing is quoted at pickup. Open a cash account to streamline repeat orders.
Do you ship, or is it pickup only?
Will-call at the Tanner Rd yard (9915 Tanner Road, NW Houston), or Houston-metro delivery scheduled on the quote.
Prep the floor.
The flooring and floor-prep these blades are made for — same Houston yard, one pickup.
Questions people ask about the jobs these ride along with
How much trim do I need? A room-by-room calculation guide.
Calculate baseboard by measuring the perimeter of every room, subtracting door openings, then adding 10% for waste. Casing needs 17 to 20 linear feet per standard door, 14 to 17 per window. Crown takes the same perimeter as base. Shoe and quarter round match the base. The trim and casing calculator on our site does the math by room — feed in dimensions, get a total order list.
Read the answer →What trim goes where? A room-by-room guide.
Trim choice should read as a consistent system across the house, not a room-by-room patchwork. Baseboard and casing run everywhere, sized to ceiling height and door scale. Crown is reserved for formal rooms in traditional homes and skipped in modern ones. Chair rail and panel mould go in formal dining and entry. Stair trim ties the upstairs and downstairs together.
Read the answer →How do you install a tongue-and-groove ceiling?
Run the boards perpendicular to the joists, or add furring at 16 inches on centre if you need to run them the other way. Acclimate first. Start with the groove edge to the wall, blind-nail through the tongue shoulder at 45 degrees into every joist, and leave a 1/2 inch expansion gap at the perimeter for the trim to cover.
Read the answer →How do I install hardwood stair treads?
A confident DIYer can install a hardwood stair tread retrofit in a weekend. The sequence: pull carpet and staples, prep the substrate flat and quiet, acclimate the treads for 5 to 7 days, dry-fit each tread, glue with a urethane construction adhesive, fasten with stainless trim screws (countersunk), plug, sand, and finish. Risers go in before treads on a full build; after, on a retrofit.
Read the answer →



