Spec drawing
UW-M704ORB
M704 — Plain rod with hammered-edge surface texture · 9/16" Sq × 44"
Iron Balusters · 9/16" Square
UW-M704ORBPlain Hammered Edge Iron Baluster
Order # 1036839
- Satin BlackView →
- Oil Rubbed BronzeSelected
See the Oil Rubbed Bronze variant page for finish-specific notes.
- Order #1036839
- FinishOil Rubbed Bronze
- End shape9/16" Square
- Length44"
- Lead timeConfirmed at quote
A 9/16" square iron baluster with hammered-edge texture — a different surface character from the M703 hammered-face. The hammered edges catch raking light in a way that flat-face textures don't, giving a subtle vertical sparkle through the guardrail. Use it as the field baluster.
Everything on one card
- FinishOil Rubbed Bronze (ORB)
- MaterialSolid iron
- End shape9/16" Square top & bottom
- Length44"
- Center detailPlain rod with hammered-edge surface texture
- MountingEpoxy-set (UW-EPOXY)
- Pairs with9/16" Sq flat shoe, rake shoe
- UseInterior wood-stair balustrade
- Lead timeConfirmed at quote
- Minimum order1 piece
- WarrantySee Stair Parts warranty
Order these together
A baluster doesn't install alone. Most jobs need the epoxy plus the matching shoes for the flat run, rake, and top.
- UW-EPOXY
Baluster Epoxy
Sets the baluster into the tread and handrail mortise. One bottle sets approximately 30 balusters.
View part → - UW-07SB
9/16" Square Flat Shoe — Satin Black
Goes at the bottom of each baluster on level runs (landings, level rails).
View part → - UW-07ORB
9/16" Square Flat Shoe — Oil Rubbed Bronze
Goes at the bottom of each baluster on level runs (landings, level rails).
View part → - UW-03SB
9/16" Square Rake Shoe — Satin Black
Goes at the bottom of each baluster on the rake (stair angle).
View part → - UW-03ORB
9/16" Square Rake Shoe — Oil Rubbed Bronze
Goes at the bottom of each baluster on the rake (stair angle).
View part →
Plain Hammered Edge
for the trade-spec iron-baluster runs UWP supplies in Houston.
Plain Hammered Edge Iron Baluster — plain rod with hammered-edge surface texture. Use it according to the pattern logic of the stair: accent pieces need breathing room, while field pieces must repeat cleanly through rake and level runs.
Trade-spec field runs
Use M704 where the stair calls for plain rod with hammered-edge surface texture. Match shoe finish, rake-shoe count, and epoxy quantity at quote time.
Mixed pattern stairs
Pair with plain square (UW-M701 / UW-M704) balusters in alternating positions to stretch the pattern and keep the rail lighter.
Oak and hardwood stairs
The Oil Rubbed Bronze finish reads cleanly against stained oak, white oak, and painted skirt boards used in standard UWP stair packages.
Replacement layouts
A direct match when retrofitting older 9/16" iron-baluster stairs of the same shape family.
Answers, before you ask
- How should M704 be mixed with plain balusters?
- Use M704 as the decorative field piece, then break the run with plain square or round bars when the stair needs a quieter rhythm. A common approach is one decorative baluster between one or two plain bars.
- What finish should the shoes match?
- The shoes should match Oil Rubbed Bronze unless the stair is intentionally using a contrast detail. On normal UWP stair packages, match the baluster, flat shoe, and rake shoe so the hardware reads as one system.
- How is this baluster installed?
- Most iron balusters are cut to length in the field and epoxy-set into the tread and underside of the handrail. Shoes are then used to cover the cut line and finish the connection at the rake or level run.
- What finish options ship for this shape?
- This shape ships in Satin Black, Oil Rubbed Bronze. Match the shoe finish to the baluster finish before ordering so the run does not split into mismatched hardware.
- What is the lead time?
- Current material availability, production timing, pickup, and delivery are confirmed on the written quote after UWP reviews the exact SKU, species, quantity, geometry, and shop capacity.
- Do you show pricing here?
- Not on this reference page yet. The builder/trade pricing tier is in development — when it ships, pricing will appear after login. For an immediate quote, call the Tanner Rd yard at (713) 462-5045 or use the Quote List to send a project quote request.
Questions people ask about iron balusters
Iron vs. wood balusters — which one for my staircase?
Wood balusters read as traditional and warm; iron balusters read as transitional, modern, or industrial. Wood is easier to install, refinishable, and matches stained handrails. Iron is more durable, allows thinner profiles for a more open stair, and pairs well with mixed-material designs. Most Houston homes built since 2010 use iron; older traditional homes use wood. Mix them only if the design language supports it.
Read the answer →What are the IRC stair code rules in plain English?
The IRC residential stair code requires a minimum 10″ tread depth, a maximum 7-3/4″ riser height, a 3/4″ nosing overhang, 36″ minimum stair width, 6′8″ minimum headroom, and handrails on at least one side. Variation between any two treads on the same flight cannot exceed 3/8″. Most code violations on retrofit jobs come from changing the tread thickness without re-framing the stair.
Read the answer →How do I choose a stair newel post?
A newel post is the structural anchor at the top, bottom, and turns of a stair railing. The four main families are box newel (large rectangular, traditional), turned newel (classical with profile turning), modern square (clean tapered or straight), and craftsman (substantial square with shaker detail). Size to the stair scale (4 to 8 inches), match the baluster style, and use the same wood species as the handrail.
Read the answer →Stair terminology glossary — tread, riser, stringer, nosing, and the rest
A staircase has more named parts than most people realize. The tread is the horizontal walking surface; the riser is the vertical board between treads; the stringer is the diagonal structural framing; the nosing is the front lip of the tread; the skirt board is the trim against the wall. Below: every term, plain English, with a note on where each one matters for ordering and installation.
Read the answer →

