How do I work out door handing — left hand or right hand?
Stand on the side where the door swings away from you. If the hinges are on your left, it is left hand. If they are on your right, it is right hand. If you can only stand on the side the door swings toward you, add "reverse" — left hand reverse or right hand reverse. That single rule covers every interior door.
The short version
- Stand where the door swings away from you. That is the whole rule; everything else is applying it.
- Hinges on your left = left hand (LH). Hinges on your right = right hand (RH).
- Forced to stand where it swings toward you? Same reading, plus "reverse": LHR or RHR.
- Closets: the outside is the room, not the closet. Stand in the room.
- Photograph every opening with the door open, from the room side, and label it. Memory does not survive a 22-door schedule.
The full answer
Handing is the single most common ordering error on a door package, and it is expensive because a prehung door is hinged and bored before it ships. A wrong hand is not an adjustment; it is a different door. The rule itself takes ten seconds to learn — the discipline is in applying it the same way at every opening.
The rule
Position yourself on the side of the door where it swings away from you — the side you would push from. Look at the door. Hinges on your left, it is a left-hand door. Hinges on your right, it is a right-hand door. The knob is always on the opposite side from the hinges, so you can read it either way, but hinges are the reliable landmark because a slab may arrive unbored.
When you have to stand on the pull side
Some openings do not let you stand on the push side — the door swings into a small bathroom, or out into a corridor you cannot occupy. Read it from the side you can actually stand on, and mark it reverse. A door read from the pull side with hinges on the left is left hand reverse (LHR); hinges on the right is right hand reverse (RHR). Reverse is not a different swing — it is a note about which side you read it from, and suppliers expect it.
Which side counts as "outside"
- Interior room door: the outside is the hallway or the more public side. Stand there.
- Closet or pantry: the outside is the room. Never stand inside the closet to call the hand.
- Bathroom: the outside is the hall. Most bathroom doors swing in, so you are standing in the hall reading a door that swings away from you — the rule applies directly.
- Exterior door: the outside is literally outside. Most residential exterior doors swing in, so you stand outside and read a door that swings away from you.
- Door between two rooms with no obvious hierarchy: pick the side it swings away from. That is what the rule is for.
The two mistakes that ruin a schedule
- Reading from the wrong side and not saying so. Half a schedule read from the push side and half from the pull side, with no "reverse" notes, produces a delivery where some doors are right and nobody knows which decision was wrong.
- Calling the hand from a plan instead of the opening. Floor plans get mirrored, revised and reused. Walk the openings.
How to record a schedule so it survives
- Number every opening on the plan and write the number on the framing in the field.
- Photograph each opening with the door open, standing in the room, with the number visible on a piece of tape.
- Record hand, width, height, jamb depth and bore backset together. Handing alone is not a door order.
- Note the swing obstruction — a door that is technically right-hand but swings into a light switch, a toilet or a return-air grille is still wrong.
- Check the wall thickness for jamb depth before ordering prehung. A 2×6 wall or a furred-out wall needs a deeper jamb, and that is discovered on site far too often.
A last sanity check before the order goes in: stand at each opening, mime opening the door, and ask whether you would walk into the swing. If the door blocks a light switch, opens against a toilet, or swings into the path from a stair, change the hand now. The cheapest time to fix a swing is before it is hinged.
Related products at UWP
Interior doors
ConfiguratorSpec panel style, core, size, handing and bore, and submit the schedule for a quote.
View →Moulding catalogue
CatalogCasing and door stop to trim out each opening once the doors are hung.
View →Glossary
CatalogJamb, stop, backset, bore, reveal — the terms a door schedule assumes you already know.
View →Related questions
Still picking? Email us with the details — stair height, run depth, existing stair condition — and we’ll tell you what we’d actually spec.
Ask the Houston teamPublished 2026-09-14

