
16 GA Galvanized Finish Nail — 2"
- Will-call code
- 16GA16200
- Spec
- 16 ga × 2"
- Pack
- 2,500 / box
- Pickup
- Tanner Rd, Houston
Galvanized premium-steel 16-gauge straight-collated finish nails, 2" long — 2,500 per box. Fits standard 16 ga straight finish/brad nailers.
Where it's used
Baseboard & casing
The baseboard workhorse — bites the bottom plate through 1/2" drywall and holds the board flat.
Galvanized hold
Galvanized coating resists corrosion and helps the nail grip — fewer pops down the road.
Straight-collated
Straight stick collation for 16 ga finish/brad guns. Premium steel drives clean without bending in hardwood.
Pairs with: Baseboard, casing, and the 18 ga brads (18GA18125) for shoe. DAP Power Point 200 caulk for the top edge.
Questions
Is 16 ga right for baseboard?
Yes — 16 ga is the trade workhorse for baseboard and casing. It bites the bottom plate / studs through drywall and holds the board flat. For thinner profiles the shorter lengths work; 2" is the all-rounder.
How do I order this?
Order by code at the will-call counter (NW Houston / Tanner Rd). Pricing is quoted at pickup. Open a cash account to streamline repeat orders.
Do you ship, or is it pickup only?
Will-call at the Tanner Rd yard (9915 Tanner Road, NW Houston), or Houston-metro delivery scheduled on the quote.
Fasten it. Finish it.
The baseboard, shoe, and quarter round these go on — pulled from the same yard so you leave with the whole job.
Questions people ask about the jobs these ride along with
How much trim do I need? A room-by-room calculation guide.
Calculate baseboard by measuring the perimeter of every room, subtracting door openings, then adding 10% for waste. Casing needs 17 to 20 linear feet per standard door, 14 to 17 per window. Crown takes the same perimeter as base. Shoe and quarter round match the base. The trim and casing calculator on our site does the math by room — feed in dimensions, get a total order list.
Read the answer →What trim goes where? A room-by-room guide.
Trim choice should read as a consistent system across the house, not a room-by-room patchwork. Baseboard and casing run everywhere, sized to ceiling height and door scale. Crown is reserved for formal rooms in traditional homes and skipped in modern ones. Chair rail and panel mould go in formal dining and entry. Stair trim ties the upstairs and downstairs together.
Read the answer →How do you install a tongue-and-groove ceiling?
Run the boards perpendicular to the joists, or add furring at 16 inches on centre if you need to run them the other way. Acclimate first. Start with the groove edge to the wall, blind-nail through the tongue shoulder at 45 degrees into every joist, and leave a 1/2 inch expansion gap at the perimeter for the trim to cover.
Read the answer →How do I install hardwood stair treads?
A confident DIYer can install a hardwood stair tread retrofit in a weekend. The sequence: pull carpet and staples, prep the substrate flat and quiet, acclimate the treads for 5 to 7 days, dry-fit each tread, glue with a urethane construction adhesive, fasten with stainless trim screws (countersunk), plug, sand, and finish. Risers go in before treads on a full build; after, on a retrofit.
Read the answer →




