Match the shoe finish to the baluster finish for a unified look. Most iron baluster jobs need two shoes per baluster — a flat shoe at the tread or level rail, and a rake shoe at the stair pitch. Add EPOXY at the counter for the install.
Cover the cut at the bottom of the baluster on level runs, landings, and level rail sections. Match the shoe finish to the baluster finish for a unified hardware system.
1/2" Square Flat Shoe
1/2" sq · 4 finish options
Standard flat shoe for the 1/2" square baluster line. Covers the cut at the tread or level run.
Cover the bottom-cut at the rake (the angled stair pitch). The angled face of a rake shoe matches the slope of the stair so the shoe sits flush against the tread.
1/2" Square Rake Shoe
1/2" sq · 3 finish options
Standard rake shoe for the 1/2" square baluster line. Angled face matches the stair pitch.
The hardware that anchors an iron stair: newel shoes and mounting, the concealed fastener for hollow balusters on open treads, and the epoxy that sets balusters in the tread and rail.
For 1/2" hollow square iron balusters on open tread stairs and level runs — a tapered plastic insert and dowel screw hold the baluster tight to the tread without adhesive or shoes.